Assets & Resources · ManufactINS
Workforce
Skills, machine qualification, shifts and productivity — and where the skill gaps are.
What changed in Workforce recently
New · Release 2.34 · 19 November 2026
A “With integrations” button in the header of the 19 screens a plant system can strengthen — from Workforce and Shop Floor to OEE, Health & Safety, Energy and Profitability — lists what each screen gains once machine cameras, plant CCTV, SCADA and PLCs, IoT sensors, energy meters, an MES or ERP cost postings are connected, the system each needs with examples, and what the screen does today. Each capability shows its state and what it means: On only when it is built and its system has reported in the last 24 hours, Ready when it is built and starts once the system is connected, and Added with the integration when it is built and set up as part of connecting the system. Attendance recorded by a machine camera is Ready; the other capabilities are added with the integration. Connections & inbox → What connecting adds lists them all by system, with how each one connects and the screens it changes.
Improved · Release 2.21 · 17 November 2026
Master Plan: one lateness — orders forecast after their committed date on the order book — on the headline, the plant table and the plant’s own figures; an order not released says so instead of “On Track”; a crew is shown only where Workforce records the people a line needs; and a machine the floor marks idle is not given work.
Improved · Release 2.21 · 17 November 2026
Screens that hold one plant’s reference sample — Warehouses, Energy, Workforce, BOM, Routings, Dispatch, Sustainability and After-sales — no longer show it under another plant: they say the plant has no such records yet and show the figures the platform does hold for it, the Saudi industrial tariff for Riyadh among them.
Fixed · Release 2.21 · 17 November 2026
Live Operations lists only current alerts, and its plan says lines finish their work within the shift; Master Plan names the flagship’s two shifts on each machine from its sample roster, and Workforce shows where its 486 people work beside the 18 machines.
New · Release 1.82 · 13 November 2026
Financial Planning & Budgets (07 Finance & Cash): versioned monthly budgets by cost type with revenue plans by product and customer — draft → submitted → approved, a returned version with its reason; budget against actual, commitment and forecast with each forecast’s method, a variance waterfall linked to Procurement, Workforce, Cost Control, Production and Sales Orders, and revenue recognised, invoiced and collected shown apart. What the records do not hold shows as insufficient data, never zero.
More in Assets & Resources
- MachinesEvery asset with status, telemetry, health score and the maintenance behind it.
- Asset HealthHealth scores, remaining useful life and failure probability across the fleet.
- Predictive MaintenanceFailures estimated from each machine’s condition score, with the window to act and the cost of not.
- Work OrdersPreventive, predictive and corrective work, with parts, technician and MTBF / MTTR.
- Spare PartsCritical spares, the machines that use them, and reorder points from the failures expected over each part’s lead time.
- EnergyEnergy per unit, cost and idle load by plant, line and machine, with anomaly alerts.
- SustainabilityCarbon, water, waste and scrap per product and plant.