Failures estimated from each machine’s condition score, with the window to act and the cost of not.
What changed in Predictive Maintenance recently
Fixed · Release 2.65 · 20 November 2026
Predictive Maintenance → Preventive interval: a machine family with one breakdown of its own reads “plant-wide fit (1 own life)”, not “1 own lives”.
New · Release 2.44 · 20 November 2026
Predictive Maintenance → “Preventive interval”: a Weibull life curve fitted to each machine family’s breakdown history (the history the failure model reads; lives the record cuts off count as at least that long), or the default curve — wear-out shape 2, scale from the mean time between breakdowns — where there are fewer than 5 lives, said on the screen. The replacement interval with the least cost a day, in whole weeks, against running to failure or today’s interval; a part that fails at random (shape 1 or less) is told to run to failure or be watched on condition.
New · Release 2.31 · 19 November 2026
Predictive Maintenance now fits each plant’s own failure curve: a machine’s 30-day failure risk and remaining life come from the plant’s breakdown history once it has 5 breakdowns and the fitted curve beats the default in a back-test; otherwise the default curve is used and the screen says why. Spare Parts sets a reorder point for each wear part from the failures expected over its lead time, and Machines shows the machine most likely to fail.
Improved · Release 1.77 · 13 November 2026
A tab that shows another screen — OEE, Work Orders and Predictive Maintenance in Machines; Traceability and Inventory in Quality; Capacity and MRP in the Master Plan — names that screen’s own home and opens it. Back now returns to the tab you were on before, then to the screen before that.
Fixed · Release 1.77 · 13 November 2026
A tab shows only to people allowed its screen: an HSE officer, who opens Machines but not OEE, Predictive Maintenance or Work Orders, no longer sees those three tabs inside Machines — the same rule as the menu and the server’s page check.
Fixed · Release 1.76 · 10 November 2026
A line chart whose values carry a unit — the spindle vibration on Predictive Maintenance, in mm/s — makes room for its labels: the axis and the last value are no longer cut by the edge of the card. On the Arabic screens those labels sit beside the chart again, not on top of the line, and the days under the chart are all named when they fit.
More in Assets & Resources
- MachinesEvery asset with status, telemetry, health score and the maintenance behind it.
- Asset HealthHealth scores, remaining useful life and failure probability across the fleet.
- Work OrdersPreventive, predictive and corrective work, with parts, technician and MTBF / MTTR.
- Spare PartsCritical spares, the machines that use them, and reorder points from the failures expected over each part’s lead time.
- WorkforceSkills, machine qualification, shifts and productivity — and where the skill gaps are.
- EnergyEnergy per unit, cost and idle load by plant, line and machine, with anomaly alerts.
- SustainabilityCarbon, water, waste and scrap per product and plant.