Scheduling
Constraint-based production scheduling that re-simulates when something disrupts the floor.
What changed in Scheduling recently
Fixed · Release 2.65 · 20 November 2026
When orders on a line were already past their due time, Scheduling → Line loading headed its result in red “No feasible plan — the constraints conflict” and disabled Save as a scenario — then showed a plan below, with the changeover hours it gives back and the late orders named per machine. That plan is now headed for what it is: the least-late plan, because no plan can meet every due time within the machines’ hours. A machine with too few hours for its work is still “no feasible plan”.
New · Release 2.44 · 20 November 2026
Scheduling → “Batch schedule”: which vessel makes each batch and in what order for the least cleaning — the cleaning matrix between products, full clean-in-place, a campaign limit, vessel volumes, material release and due times — by OR-Tools CP-SAT or a mixed-integer programme, every plan re-evaluated batch by batch and compared with today’s rule.
New · Release 2.27 · 19 November 2026
Scheduling → Rolling plan: period targets spread over the weeks on the lines allowed for each product, and the first week laid out day by day; a set-up is counted when a product starts on a line, not every week it keeps running; firm bookings stay, and a booking that blocks a target is pointed out with what it costs.
New · Release 2.27 · 19 November 2026
Scheduling → Line loading: each job on a machine allowed to run it, in the order that spends the least time cleaning and setting up, inside every machine’s hours and promise date; a finished search is a proven optimum.
New · Release 2.27 · 19 November 2026
Scheduling → Catch-up plan: today’s sequence rebuilt from the good units and scrap operators recorded and the machines reported down, with jobs inside the frozen window kept in place; approving it (the schedule-change authority) makes it today’s sequence until another is approved.
New · Release 2.25 · 19 November 2026
Scheduling → Campaigns: groups products into families and sequences them on one machine with direction-specific changeovers (light to dark is not dark to light), keeping locked work in place, never starting a job before its material, inside the machine’s hours and every due date — the run sequence, quantities, cleaning hours and the orders that move, against the current plan. When a locked commitment makes a delivery impossible, it is named with what to change.
More in Engineering & Planning
- ProductsProduct master, variants and revisions, with drawings and specifications.
- Bill of MaterialsMulti-level BOMs with scrap factors, preferred and alternative suppliers, and cost roll-up.
- RoutingsOperations, work centres, setup and cycle times — the bill of operations per product.
- Demand PlanningForecast by product, customer and plant, with accuracy, bias and the anomalies worth acting on.
- Master PlanThe master production schedule balancing demand, capacity, material and priority.
- Capacity PlanningLoad against capacity by line, machine and shift — and the bottlenecks forming ahead.
- MRPMaterial requirements from plan and BOM, with shortages flagged before they bite.