Engineering & Planning · ManufactINS
MRP
Material requirements from plan and BOM, with shortages flagged before they bite.
More in Engineering & Planning
- ProductsProduct master, variants and revisions, with drawings and specifications.
- Bill of MaterialsMulti-level BOMs with scrap factors, preferred and alternative suppliers, and cost roll-up.
- RoutingsOperations, work centres, setup and cycle times — the bill of operations per product.
- Demand PlanningForecast by product, customer and plant, with accuracy, bias and the anomalies worth acting on.
- Master PlanThe master production schedule balancing demand, capacity, material and priority.
- Capacity PlanningLoad against capacity by line, machine and shift — and the bottlenecks forming ahead.
- SchedulingConstraint-based production scheduling that re-simulates when something disrupts the floor.