Capacity Planning

Load against capacity by line, machine and shift — and the bottlenecks forming ahead.

What changed in Capacity Planning recently

  1. New · Release 2.27 · 19 November 2026

    Capacity Planning → Capacity check: each month’s orders loaded on the lines and machines allowed to make them, with the gap — units that will not fit, lines that are full, orders due in a short month — now and with demand changed or a line losing hours.

  2. New · Release 2.26 · 19 November 2026

    Capacity Planning → Capacity over 6–18 months: overtime, an extra shift, subcontracting and a capital investment compared month by month — when each one’s hours arrive, which months and orders it protects, the cash it needs and the investment’s payback — with an unmet hour priced at the contribution it loses, and every assumption listed.

  3. New · Release 2.25 · 19 November 2026

    Capacity Planning → Plant allocation: how much of an order each qualified plant should make, from its cost, yield, free hours, material, freight, transfer days and the orders it would push out — and why the lowest unit-cost plant can cost more once freight and displaced work are counted.

  4. Improved · Release 2.21 · 17 November 2026

    Capacity Planning excludes idle machines as Scheduling does, leads with the call on the constraint its header names, prices overtime as hours × each centre’s crew × the overtime rate, and states its status thresholds; the capital budget forecasts from the plan’s phasing.

  5. Fixed · Release 2.21 · 17 November 2026

    A re-sequence never makes the latest order later: where every move would, Scheduling keeps the sequence and points to Capacity Planning, and the changeover total is one figure.

  6. Fixed · Release 2.06 · 15 November 2026

    Capacity utilisation is one figure everywhere — Capacity Planning’s planned load, required ÷ available hours over the producing work centres. The scope strip, Compare, the plant header, the simulator and the assistant quoted the plant register’s figure instead (80% against 88% for all plants; 84% against 96% for Cairo Automotive).