What changed in Quality recently
New · Release 2.46 · 20 November 2026
On a client plant, Machines, OEE, Quality, Planning and Decisions show its own data. Machines and lines are as loaded. A machine with an open stop or breakdown is down. Machines with log records show their measured OEE (availability × performance × quality over the log’s 30 days); a machine without records shows no state, never a number. NCRs are raised against its own products and materials.
Fixed · Release 2.38 · 19 November 2026
Quality-hold recovery and the planning workbench counted a machine’s booked time as clock time — a run across a night or a weekend used up hours nobody works — while its capacity counted working hours only. In the afternoon or before a weekend the qualified crew could show 0 free hours and every in-house route came out infeasible. Booked time is now counted in working hours inside the planning window, like the capacity.
Improved · Release 2.29 · 19 November 2026
Quality → Visual inspection: when an AI model that reads images is set up, it compares each finish photo or inspection-camera frame with up to three of the product’s accepted-quality reference photos, and gives a verdict, a match out of 100 and what it saw, in English and Arabic. Grading runs after the photo is saved, so a worker finishing a job is not kept waiting, and at most 30 photos a minute are graded.
New · Release 2.24 · 19 November 2026
Quality hold & recovery on every order of the book: open a hold on the units in question (it is raised as an NCR on the order), see the material lots and heats issued to it, and five recovery routes — in-house by due date, in-house expedited, in-house with a third shift on the constraint, a subcontractor, or ship the good units on time and the recovered ones later.
Improved · Release 2.21 · 17 November 2026
Each decision card says where its figures come from — recorded data, the plant model, a scenario or a sample narrative — beside its confidence; Autonomous Operations’ figures come from the order book, the Overview and Quality.
New · Release 2.08 · 15 November 2026
What-if studio: the flask button in the top bar, or “Try a what-if on this figure” in any ƒ panel, opens a sandbox on a plant. You can change selling prices, demand, material prices, USD/EGP, the electricity tariff, wages, people, added shifts, machines down, extra scrap, a late material or the CBE rate. The platform’s own model recomputes every figure the change reaches, across Overview, OEE, Quality, Capacity, Profitability, Cost, Energy, Sales Orders, MRP, Procurement, the Decision Center, the best decisions package and Predictions. Each is shown before → after, with a loading state and the changed figures highlighted. Nothing is recorded.
Pages that cover Quality
- Quality management software for manufacturing: NCR to CAPANCRs with photos and disposition, closed with a root cause and CAPA; first-pass yield and the defect Pareto.
- Manufacturing traceability software, from maker to customerAny lot, heat or batch traced from maker to customer, with its certificate and recall scope to the unit.
More in Quality & Safety
- Non-ConformanceNCRs from detection through containment, root cause and verified closure — with the closed NCRs most like each one and a 5-Why draft that cites them.
- CAPACorrective and preventive actions, with the recorded root cause and a test of whether each fix lowered the defect’s recurrence.
- TraceabilitySupplier batch to finished product — full genealogy, lot and serial, for instant recall scope.
- Health & SafetyIncidents, near misses, LTIFR and TRIR, permits to work, toolbox talks and the corrective actions still open.