MANUFACT.INS
Sign in

Production · ManufactINS

Production Orders

Orders through release, setup, run and completion, against BOM and routing.

What changed in Production Orders recently

  1. Improved · Release 2.21 · 17 November 2026

    One state for an order on every screen: an order in production is running, next or queued in today’s sequence; one on material hold or in final inspection is released but held off the machines; a planned order is not released yet. Sales Orders, Production Orders, Scheduling, the Master Plan and the Shop Floor now agree, and the Shop Floor’s made-to-date is the figure Scheduling plans the rest from.

  2. Fixed · Release 1.77 · 13 November 2026

    Order, lot, batch and NCR numbers stay whole in tables on tablets and desktops too: in a crowded column “SO-WT-2611” broke after each hyphen onto three lines on the Master Plan, Production Orders, Traceability and Finished Goods. Every screen was checked at 375, 768 and 1440 pixels wide, in English and Arabic.

  3. New · Release 1.60 · 6 November 2026

    Barcode labels: lots and materials on Inventory, Production Orders and Machines print Code 128 and QR labels with the number written under the code — an A4 sheet of ten or single 100 × 50 mm labels.

  4. Improved · Release 1.57 · 3 November 2026

    Ask, its live context, reports and exports read the recomputed figures and say what was recorded on the floor beside the model’s figure; the Cost screen lists what recorded scrap, rework and machine stops cost, and Production Orders show the pieces made today.

  5. Improved · Release 1.51 · 31 October 2026

    Material issues follow the bill of materials: the running order is issued its whole bill, the next order half, and the delivered order took its full bill from the oldest lot — the same quantities Production Orders shows on each part of the assembly tree.

  6. New · Release 1.50 · 31 October 2026

    Assembly tracking on Production Orders: each open order’s product tree — the final assembly, its sub-assemblies, made parts and bought parts, with the quantity per parent — and every operation on every node: where it runs, setup and cycle time, and the quantity done of the quantity required.